| | | Be it enacted by the People of the State of Maine as follows: |
|
| | | Sec. 1. 38 MRSA §490-B, 2nd ¶, as enacted by PL 1995, c. 700, §22, is | | amended to read: |
|
| | | A person in possession of a valid site location of development | | permit for a borrow pit or topsoil, clay or silt mining operation | | shall operate that pit or operation in compliance with the terms | | and conditions of the permit until and including November 30, | | 2005 or until a complete notice of intent to comply under this | | article is filed with the department, whichever comes first. Any | | modification of the permit must be in conformance with section | 484. A person with a permit under article 6 may shall file a | | notice of intent to comply under this article. The permit issued | | under article 6 lapses as of December 1, 2005 or the date a | | complete notice of intent is filed with the department, whichever | comes first. If the permittee chooses to substitute a | notification pursuant to this article, all All terms and | | conditions that applied to the permit issued pursuant to article | | 6 are incorporated into the notification approved pursuant to | | this article. |
|
| | | Sec. 2. 38 MRSA §490-D, sub-§14, as amended by PL 2001, c. 466, §9, is | | further amended to read: |
|
| | | 14. Reclamation. Except as provided in subsection 15, the | | affected land must be restored to a condition that is similar to | | or compatible with the conditions that existed before excavation. | | Reclamation should be conducted in accordance with the | | department's best management practices for erosion and sediment | | control, and must include: |
|
| | | A. Regrading side slopes to a slope no steeper than 2 1/2 | | horizontal feet for each vertical foot; |
|
| | | B. Establishing a vegetative cover by seeding within one | | year of the completion of excavation. Vegetative cover is | | acceptable if, within one year of seeding: |
|
| | | (1) The planting of trees and shrubs results in a | | permanent stand or a stand capable of regeneration and | | succession, sufficient to ensure a 75% survival rate; | | and |
|
| | | (2) The planting of all materials results in permanent | | 90% ground coverage; |
|
| | | C. Removing all structures and, once no longer in use, | | reclaiming all access roads, haul roads and other support | | roads; |
|
|