that are eligible for funding with proceeds from bonds authorized | by section 1994, subsection 2.__In making this determination, the | department and the authority may consider the following factors: |
|
| A.__The existing access roads and the state highway system; |
|
| B.__The traffic impact of the maintenance, construction or | reconstruction on the existing road network; |
|
| C.__The total cost of the state highway system; |
|
| D.__The probable change in departmental expenditures | resulting from maintenance, construction or reconstruction | of the department project; |
|
| E.__The relative number of vehicles using or expected to use | the department project on the way to or from the East-West | Highway; |
|
| F.__The road distance or average road distance of the | department project or portions of the department project | from the nearest entrance to or exit from the East-West | Highway; |
|
| G.__The effect that maintenance, construction or | reconstruction will have on the flow of traffic to, from and | on the East-West Highway and in diverting vehicular traffic | off or away from the East-West Highway; |
|
| H.__The proportionate usage of the state highway system by | vehicles using the East-West Highway and vehicles not using | the highway; |
|
| I.__Vehicle classification and travel characteristics; |
|
| J.__Origins and destinations of trips; |
|
| K.__Fuel type and consumption; |
|
| L.__Existing sources of revenue; and |
|
| M.__Any other factors considered relevant, including, but | not limited to, expert opinion. |
|
| §1999-B.__Provisions in case of default on bonds |
|
| | Except as may otherwise be provided in a bond resolution or | trust indenture or loan or security agreement, in the event that | the authority defaults in the payment of principal or interest on | any | of its bonds after the principal or interest falls due and |
|
|