Sec. 1. 23 MRSA §3360-A, sub-§1-A, as enacted by PL 1991, c. 437, §2
and affected by §12, is amended to read:

 
1-A. Damage prevention system. Each underground facility
operator must shall be a member of and participate in an
underground facility damage prevention system, referred to in
this section as the "system." The system shall operate during
regular business 24 hours each day throughout the year. The
system shall must receive notices of proposed excavations and
immediately transmit those notices to underground facility
operators whose facilities may be affected. The cost for
operation of the system must be apportioned equitably among
members. Nothing in this subsection prohibits a municipality,
utility or other entity that owns or operates an underground
facility from voluntarily becoming a member of the system.
Notwithstanding subsection 1, paragraph F, a person that
voluntarily becomes a member of the system is deemed an
underground facility operator for the purposes of this section.

 
Sec. 2. 23 MRSA §3360-A, sub-§4, as amended by PL 1991, c. 437, §5 and
affected by §12, is further amended to read:

 
4. Response to notice. An underground facility operator
shall, upon receipt of the notice provided for in subsection 3-A,
advise the excavator of the location and size of the operator's
underground facilities in the proposed excavation area by marking
the location of the facilities with stakes, paint or by other
identifiable markings. The marking must identify a strip of land
not more than 3 feet wide directly over the facility or a strip
of land extending not more than 1 1/2 feet on either side of the
underground facility and must indicate the depth of the
underground facility, if known. The underground facility operator
shall complete this marking no later than 2 full business days
after receipt of the notice. After the underground facility
operator has marked the location of that operator's underground
facilities in the proposed excavation area, the excavator is
responsible for maintaining the markings at the location, unless
the excavator requests remarking at the location due to
obliteration, destruction or other removal of the markings. The
underground facility operator shall remark the location within
one business day following the receipt of a request to remark.

 
If the proposed excavation is of such length or size that the
underground facility operator advises the excavator that the
operator can not reasonably respond with respect to all the
operator's underground facilities within 2 full business days,
the excavator shall notify the operator of the specific location


LD 2427 Title Page Top of Page Page 2 of 4